Default Image

Road Work Along PVDS

Work on Palos Verdes Drive South, through the landslide, is scheduled to begin Tuesday, May 18, and will continue through the week to repair the roadway surface between Peppertree Drive and Narcissa Drive. The surface of the road is being lowered in some areas and raised in other areas to help smooth the vertical transitions throughout the landslide. The roadway will be limited to one lane in each direction, and traffic control personnel will be in place as part of the work zone setup. Expect delays when driving this area next week between the hours of 8:00 am and 4:00 pm. Drivers should proceed cautiously through the work zone and carefully follow work zone signs and instructions.

Share on Facebook
Share on Twitter
Share via Email

Copyright 2019 Rancho Palos Verdes. All Rights Reserved.
30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275

Powered by
CivicSend - A product of CivicPlus