Traffic Alert

Traffic Alert: Roadway Repairs Through Landslide 9/6-9/16


Work scheduled to take place in two areas in the landslide beginning on September 6, 2022, and concluding on September 16, 2022, barring any unforeseen conditions. Construction will begin at 8 a.m. and conclude by 4 p.m. each weekday. No construction activity will be performed on the weekends. 
 
Repairs to infrastructure will be made in Seaview area near the intersection of Dauntless Drive and Exultant Drive. The work will include repairing asphalt, concrete curb and gutter, and two driveway approaches in the public Right-of-Way. Additionally, repairs will be made to a catch basin in the median area of Palos Verdes Drive South close to Wayfarers Chapel.
 
Traffic control will be in place at both locations. Therefore, expect delays when driving in either of these areas. Please slow down, drive cautiously, and obey all signs and instructions when driving through the work zones.

Share on Facebook
Share on Twitter
Share via Email

Copyright 2019 Rancho Palos Verdes. All Rights Reserved.
30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275

Powered by
CivicSend - A product of CivicPlus