Did the grade elevations in Areas 5 and 6 (vacant area southwest of property) change?
Highly likely.

Areas 5 and 6 are approved to be used for stockpiling of soil while other parts of the cemetery are developed/improved over time. As earth is placed and removed from the area, it is inevitable that the grades will continuously change.

It should be noted that the Master Plan shows future mausoleum buildings in the west half of this area. For future development applications for these mausoleum buildings, the baseline grades will be based on the 2011 topographic survey filed with the City. Any improvements in this area will be subject to review with opportunities for public input.

Show All Answers

1. What are the allowed construction hours?
2. Are the existing ground interments closer than the required 8' setback from the north property line?
3. Are there any noise restrictions?
4. Is the Inspiration Slope Mausoleum building height taller than what was depicted by the temporary silhouette that was installed on site in 2013?
5. Did the grade elevations in Areas 5 and 6 (vacant area southwest of property) change?
6. What is the review process for new mausoleum buildings or rooftop interments?
7. Is an Annual Review still required?