Shower pan (poured in place)

 “Built-in place” shower bases shall be lined in accordance with the code and filled with water.  This inspection is typically requested at the same time as the drywall inspection. (Pan slope inspected.)

Show All Answers

1. Drywall/Shower Wallboard/Tile backer Inspection
2. Electrical
3. Electrical Service Panel
4. Exterior Underground Gas Line
5. Final Inspection
6. Rough Inspections
7. Framing
8. Foundation
9. Insulation Inspection
10. Interior gas lines/release
11. Lath/wrap Inspection
12. Plumbing/Mechanical
13. Roof sheathing and shear
14. Rough or precise grading
15. Shower pan (poured in place)
16. Special Inspections
17. Subfloor Insulation
18. Subsoil plumbing (or underfloor)
19. Temporary power pole
20. Underfloor and frame Inspection